Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13669571
- Product Categories
- Friendly Links
Information Name: | QL-SD-30T flashlight screw hoist Price / manufacturers Shelf |
Published: | 2015-03-14 |
Validity: | 30 |
Specifications: | 30T |
Quantity: | 1000.00 |
Price Description: | |
Detailed Product Description: | (A), hoist installation method a basic building hoist installation must be firm and safe. Base and concrete foundation member, according to the provisions drawings pouring concrete strength at the time did not meet the design strength, are not allowed to remove and change the temporary support hoist, but not for debugging and commissioning. 2, according to the lifting hoist installation centerline, vertical and horizontal alignment to the centerline of the center so that the deviation does not exceed ± 3mm, elevation deviation does not exceed ± 5mm. 3, hoist installation of electrical equipment, compliance with drawings and specifications, and all the electrical equipment are grounded. 4, each hoist is installed on the hoist to clean up, repair damaged protective paint, pouring grease. (Two), commissioning a hoist, hoist under no load conditions to ensure that no more than a three-phase current imbalance ???? ± 10%, and the measured current value. 2, the main hoist controllers make adjustments to make sure the lift gate on the lower bit error does not exceed 1cm. (Three), the gate lifting rail mounting a former rail mounting, shape and size of the rail inspection, found value bend, twist, etc. deformation, correction, after inspection and approval before installation. 2, before lifting the track, measurement and calibration installation baseline orbit. The horizontal centerline of the actual track position deviation mounting reference line: when the span is less than or equal to 10m, no more than 2mm; when the span is greater than 10m, no more than 3mm. 3, the top surface of the longitudinal inclination of the track is not more than 1/1000, 2m measured every point on the full stroke, the difference between the highest and lowest points is not more than 10mm. 4, track installation meets the requirements, a comprehensive review of the case and tighten each bolt. 5, the car blocked the track ends, before lifting cranes installed. |
Admin>>>
You are the 7561 visitor
Copyright © GuangDong ICP No. 10089450, Jizhou City Huixin Water Machinery All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 7561 visitor
Copyright © GuangDong ICP No. 10089450, Jizhou City Huixin Water Machinery All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility